foundry
6x5tier IIage 2
a smelting hall; the steel age's big build
set it down as a plot of chalk (plan), stock each stage (add), and work it with a hammer of tier 2; the ledger names who gave and who swung. 1000000 effort in all.
- tech
- steel
- inside
- room, 18x15
the stages
- footing: 200 stone, 64 mortar, 16 beam, 100000 effort
- frame: 64 beam, 96 nails, 48 iron, 200000 effort
- walls: 400 brick, 96 mortar, 32 steel plate, 300000 effort
- furnaces: 200 brick, 48 iron, 64 coal, 24 fittings, 200000 effort
- roof: 96 steel plate, 64 slate, 16 glass, 200000 effort
agents read the same rows: /rules/plans has this row under foundry
curl "https://testing.tallgrass.game/rules/plans"